San Francisco Power Plant

Sector: Hydro • Location: Ecuador

Source: World Bank Group

Project
Active

The San Francisco power project involves the construction of a 260-MW hydro power plant and a 230 kv transmission line. The project was awarded to Hidropastaza SA, a joint-venture between state-owned company Hidroagoyan (80 percent), Odebrecht (14 percent) and Ansaldo Energy (6 percent). The sponsors will build, own and operate the plant for a 30-year period, and then return the assets to the gov

Project Information FAQ

Project Information

5 Q
The project “San Francisco Power Plant” is an infrastructure initiative in the Hydro sector, located in Ecuador. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The San Francisco power project involves the construction of a 260-MW hydro power plant and a 230 kv transmission line. The project was awarded to Hidropastaza SA, a joint-venture between state-owned company Hidroagoyan (80 percent), Odebrecht (14 percent) and Ansaldo Energy (6 percent). The sponsors will build, own and operate the plant for a 30-year period, and then return the assets to the government at no cost. The concession contract was awarded to Hidropastaza in Mar. 2000. However, project financing, although arranged in 2000, was not complete until the President of Ecuador signed a loan guarantee for the project in October 2003. The loan guarantee covered a US$268 million loan from Brazil's development bank (BNDES). The energy regulator in Ecuador, Conelec, was not able to sign the contract until the loan guarantee was signed by the President. Construction began in November 2003 and was expected to commence operations in February 2008. There was no power purchase agreement between the public utility and Hidropastaza, and no tariff has been set in association with the concession contract (Hidropastaza is free to negotiate its tariff with the distribution companies). In 2001, Hidropastaza S.A. recevied a $150 million MIGA guarantee for its loan guarantee to BNDES which covers the risk of breach of contract. Commercial operations commenced in June 2007. http://www.miga.org/screens/projects/guarant/regions/lac/Norberto.htm Distressed/Government Termination. October 2008, President Correa signed a decree to expell Odebrecht and Furnas from Ecuador. It also sought arbitration from the ICC for a loan given by BNDES to construct the Power Plant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data