San Francisco Power Plant

Sector: Hydro • Location: Ecuador

Source: World Bank Group

The San Francisco power project involves the construction of a 260-MW hydro power plant and a 230 kv transmission line. The project was awarded to Hidropastaza SA, a joint-venture between state-owned company Hidroagoyan (80 percent), Odebrecht (14 percent) and Ansaldo Energy (6 percent). The sponsors will build, own and operate the plant for a 30-year period, and then return the assets to the gov

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Power Transmission, Government, Commercial
Location
Ecuador
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about San Francisco Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “San Francisco Power Plant” is an infrastructure initiative in the Hydro sector, located in Ecuador. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The San Francisco power project involves the construction of a 260-MW hydro power plant and a 230 kv transmission line. The project was awarded to Hidropastaza SA, a joint-venture between state-owned company Hidroagoyan (80 percent), Odebrecht (14 percent) and Ansaldo Energy (6 percent). The sponsors will build, own and operate the plant for a 30-year period, and then return the assets to the government at no cost. The concession contract was awarded to Hidropastaza in Mar. 2000. However, project financing, although arranged in 2000, was not complete until the President of Ecuador signed a loan guarantee for the project in October 2003. The loan guarantee covered a US$268 million loan from Brazil's development bank (BNDES). The energy regulator in Ecuador, Conelec, was not able to sign the contract until the loan guarantee was signed by the President. Construction began in November 2003 and was expected to commence operations in February 2008. There was no power purchase agreement between the public utility and Hidropastaza, and no tariff has been set in association with the concession contract (Hidropastaza is free to negotiate its tariff with the distribution companies). In 2001, Hidropastaza S.A. recevied a $150 million MIGA guarantee for its loan guarantee to BNDES which covers the risk of breach of contract. Commercial operations commenced in June 2007. http://www.miga.org/screens/projects/guarant/regions/lac/Norberto.htm Distressed/Government Termination. October 2008, President Correa signed a decree to expell Odebrecht and Furnas from Ecuador. It also sought arbitration from the ICC for a loan given by BNDES to construct the Power Plant.

Original sector

Energy

Procurement method

Budget

Location

Country

Ecuador

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Power Transmission, Government, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project