logo

San Francisco Station Escalator Replacement

Sector: Advanced Electronics • Location: San Francisco, California

Source: BART Projects

Project
Current Projects

The Market Street Escalators Renovation Project will install and replace 41 escalators at Embarcadero, Montgomery, Powell and Civic Center Stations. Of the escalators to be replaced, 22 are street to concourse level and 18 connect concourse with station platforms. Additionally, a street level escalator at Civic Center Station will be relocated to

Project Information FAQ

Project Information

4 Q
The project “San Francisco Station Escalator Replacement” is an infrastructure initiative in the Advanced Electronics sector, located in San Francisco, California. Taiyo aggregates data on it from BART Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

current projects

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Market Street Escalators Renovation Project will install and replace 41 escalators at Embarcadero, Montgomery, Powell and Civic Center Stations. Of the escalators to be replaced, 22 are street to concourse level and 18 connect concourse with station platforms. Additionally, a street level escalator at Civic Center Station will be relocated to the entrance closest to the Orpheum Theatre which currently has only stairs. Completed: Civic Center Station street level Powell St. Station platform level x2 Powell St. Station street level Montgomery St. Station platform level Motgomery St. Station street level Work Underway: Embarcadero Station platform level Montgomery St. Station platform level Powell St. Station platform level Civic Center Station street level Future Work: Embarcadero Station platform level: 3 Embarcadero Station street level: 6 Montgomery St. Station platform level: 3 Montgomery St. Station street level: 6 Powell St. Station platform level: 2 Powell St. Station street level: 4 Civic Center Station platform level: 4 Civic Center Station street level: 3 On March 14, 2019, The BART Board of Directors approved the single largest contract for escalator replacement in BART history. The $96.5 million contract for the Market Street Escalators Renovation Project will install and replace 41 escalators at Embarcadero, Montgomery, Powell and Civic Center Stations. Of the escalators to be replaced, 22 are street to concourse level and 18 connect concourse with station platforms. Additionally, a street level escalator at Civic Center Station will be relocated to the entrance closest to the Orpheum Theatre which currently has only stairs. The project will enhance rider safety and escalator reliability. A key provision of the program requires the contractor to maintain a reliability rate of at least 96% for the new escalators during the life of the nearly ten-year contract. It’s anticipated BART can complete work on six escalators per year, though COVID-19 presented challenges in 2021 and 2022. Phase Two of the Measure RR funded escalator overhaul program will involve 38 escalators at downtown Oakland's 12th St. and 19th St. Stations, and at San Francisco's 16th/Mission St. and 24th/Mission St. Stations. Future phases will involve the remaining 96 escalators. The new escalators incorporate the latest technology with multiple improvements.The parallel canopy project is bringing as many as 22 new entrances to downtown San Francisco stations that include new entrance gates, screens with real-time transit information, and multiple security cameras. An edition of our podcast series “Hidden Tracks Stories from BART” features Mark Dana who is the manager of the Market Street Escalators Renovation Project. The new escalators are built especially for the challenges they'll face at BART and are a key part of the plan to revitalize the entrances to some of BART's busiest stations.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data