San Gaban III
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project envisages the construction and operation of a 205.8 MW hydro power plant in Carabaya Province, Puno Region. Project is being undertaken by a Joint venture of China Three Gorges Corporation and EDP Energías de Portugal - Hydro Global Peru S.A.C. This is a greenfield project launched on a Build operate and transfer basis. The concession period has a duration of 30 years, at the end of w
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Peru
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about San Gaban III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project envisages the construction and operation of a 205.8 MW hydro power plant in Carabaya Province, Puno Region. Project is being undertaken by a Joint venture of China Three Gorges Corporation and EDP Energías de Portugal - Hydro Global Peru S.A.C. This is a greenfield project launched on a Build operate and transfer basis. The concession period has a duration of 30 years, at the end of which the ownership of the facility will be transferred to Empresa de Generacion Electrica San Gaban (EGESG). The contract was won following a competitive bidding process. Criteria was not disclosed. The total output generated by the plant will be supplied to National Interconnected Electric System (SEIN) over the lifespan of the concession. Total investment is estimated at $438 million and is funded by debt and equity in 83:17 ratio. Project finance was provided by China Development Bank in November 2017 in the amount of $365 million. The remaining $73 million is contributed as equity by the two sponsors, in equal proportion - $36.5 million each. Construction is reported to have begun in September 2017, with completion scheduled for August 2021. http://www.globallegalchronicle.com/hydro-global-peru-s-a-c-s-365-million-loan/ http://www.hydroworld.com/articles/2017/12/peru-s-san-gaban-project-receives-chinese-cash-infusion.html https://gestion.pe/economia/hidroelectrica-san-gaban-iii-recibe-financiamiento-us-438-mllns-219754 |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Peru |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
