logo
ProjectProject In Operation

San Jerónimo de Cusco Wastewater Treatment Plant Development PPP Project in Peru

One of 40 projects Taiyo tracks in Cusco.

Source: InfraPPPWorld

The project involves the improvement and expansion of the San Jerónimo de Cusco wastewater treatment plant (WWTP) in Cusco, Peru.The San Jerónimo WWTP is currently functioning at its designated maximum capacity of 580 liters/second. Even during peak periods, the flow surges, exceeding 800 liters/second. The project encompasses the conceptualization, funding, construction, operation, and maintenanc

Status
Under Construction
Sector
Power Transmission, Water Supply and Storage, Power Generation (CCGT), Government
Location
Cusco, Peru
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about San Jerónimo de Cusco Wastewater Treatment Plant Development PPP Project in Peru

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “San Jerónimo de Cusco Wastewater Treatment Plant Development PPP Project in Peru” is an infrastructure initiative in the Power Transmission sector, located in Cusco, Peru. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Status

Original status

project in operation

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the improvement and expansion of the San Jerónimo de Cusco wastewater treatment plant (WWTP) in Cusco, Peru.The San Jerónimo WWTP is currently functioning at its designated maximum capacity of 580 liters/second. Even during peak periods, the flow surges, exceeding 800 liters/second. The project encompasses the conceptualization, funding, construction, operation, and maintenance of this infrastructure for a span of 23 years. The intended beneficiaries are an anticipated population of approximately 750,000 residents within the city of Cusco. This plant is slated to possess the capability to process 200,000 m3 of wastewater daily. The treated water will find utility in irrigation and various non-potable applications. By mitigating pollution and enhancing water quality, this plant stands to elevate the quality of life for the Cusco populace.

Original sector

Water & Waste

Procurement method

Budget

Location

Country

Peru

State

Cusco

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Power Transmission, Water Supply and Storage, Power Generation (CCGT), Government

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project