logo

San José - Yarabamba, Piura Nueva - Colán, Belaunde Terry - Tarapoto Norte Transmission Lines

Sector: Power Generation (CCGT) • Location: Peru

Source: World Bank Group

Project
Active

This project involves the modernization and expansion of the San José - Yarabamba, Piura Nueva - Colán, Belaunde Terry - Tarapoto Norte transmission lines, located in San Martin, Arequipa, Lambayeque and Piura regions, Peru. The sponsor for this initiative, the Interconexión Eléctrica (ISA), won a 30-year concession with an additional offer of O&M annual fee of $2.6m. The San José - Yarabamba tran

Project Information FAQ

Project Information

4 Q
The project “San José - Yarabamba, Piura Nueva - Colán, Belaunde Terry - Tarapoto Norte Transmission Lines” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project involves the modernization and expansion of the San José - Yarabamba, Piura Nueva - Colán, Belaunde Terry - Tarapoto Norte transmission lines, located in San Martin, Arequipa, Lambayeque and Piura regions, Peru. The sponsor for this initiative, the Interconexión Eléctrica (ISA), won a 30-year concession with an additional offer of O&M annual fee of $2.6m. The San José - Yarabamba transmission line will have 500kV capacity with a total of 50km and additional works for the expansion of the San Jose 500/220 kV and Yarabamba 500 kV substations. The Piura Nueva - Colán transmission line will have 220kV capacity with a total length of 67.7km and it will provide a connection between Piura Nueva and Nueva Colan substations. The Belaunde Terry - Tarapoto Norte transmission line will have 220kV capacity with and includes the installation of two circuits - Belaunde Terry - Tarapoto Norte 220kV with 87km and Tarapoto Norte - Punto 138 kV with 15km, a total of 102km. The total project cost is $85.9m. The financial close date is August 25th, 2023. https://www.investinperu.pe/es/pi/detalle-noticia/proinversion-adjudica-a-isa-y-alupar-dos-grupos-d https://www.investinperu.pe/es/app/DatosProyecto?idAPProyecto=649 https://www.ijglobal.com/articles/177232/peru-awards-transmission-ppps-worth-200m https://gestion.pe/economia/empresas/las-dos-empresas-adjudicadas-en-cinco-proyectos-electricos-por-us-118-millones-cuales-son-mef-alex-contreras-isa-alupar-noticia/?ref=gesr

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data