logo

San Jose – San Ramon toll road

Sector: Commercial • Location: Costa Rica

Source: World Bank Group

Project
Cancelled

In 2004, Costa Rica’s public works and transportation ministry (MOPT) awarded a 25-year BOT concession for the San Jose – San Ramon toll road to SC Autopistas del Valle SA. According to the contract, the concessionaire had to build six overpasses, expand Autopista General Cañas from four to six lanes and the Bernardo Soto road from two to four lanes. The concessionaire was also resp9onsible for th

Project Information FAQ

Project Information

5 Q
The project “San Jose – San Ramon toll road” is an infrastructure initiative in the Commercial sector, located in Costa Rica. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2004, Costa Rica’s public works and transportation ministry (MOPT) awarded a 25-year BOT concession for the San Jose – San Ramon toll road to SC Autopistas del Valle SA. According to the contract, the concessionaire had to build six overpasses, expand Autopista General Cañas from four to six lanes and the Bernardo Soto road from two to four lanes. The concessionaire was also resp9onsible for the expansion of the Santa Ana – San Antonio beltway, building a nw beltway around San Antonio and Rio Segundo de Alajuela, and building required pedestrian bridges, bus stops safety zones and the toll booths. SC Autopistas del Valle SA was owned by Concesiones Viales de Costa Rica (a subsidiary of FCC), Itinere Costa Rica (a subsidiary of Sacyr Vallehermoso), Soares da Costa Concesiones Costa Rica (a subsidiary of Soares da Costa) and M&S Concesiones (50% owned by FCC). The project required an estimated investment of US$270 million. Project funding was secured in 2005. The Inter American Development Bank (IADB) provided a US$100 million loan and backed a US$96 million loan from Caja de Madrid. The concessionaire financed the rest, including a US$34.2 million payment to the government for compensations needed for land expropriation. Costa Rica’s Nacional Concessions Council (CNC) granted the contract through a public tender in 2004 and in June declared the only bidder, SC Autopistas del Valle SA (at that time known as Consorcio Vial San Jose – San Ramon), the winner of the 25 year concession. However, the Attorney General had some issues with the contract, thus delaying the final approval until May 2005. The highway was designed with five tollbooths and users would pay depending on the length of their journey, with a maximum toll charge of US$1.30 for cars, US$2.60 for buses, US$3.25 for two or three axis trucks and US$8.23 for 5 or more axis trucks. The project was expected to be completed by May 2008. In March 2013, the contract was acquired by Brazilian firm OAS for US$ 34 million. President Laura Chinchilla appeared on national television on April 22, 2013 to confirm that the 30-year concession would be cancelled in light of public opposition. Opponents of the highway had complained that such an important national road should not be concessioned, and that the proposed US$3.9 one-way tariff was too high. Opponents also charged Pedro Castro, head of Costa Rica's public works and transport ministry, MOPT, with a conflict of interest in awarding the concession due to his consultancy role with OAS between May and August 2012. The US$524mn rehabilitation and expansion of the 57.9km highway was expected to wrap up within 30 months, according to the public works and transport ministry MOPT. The concession contract was cancelled in April 2013. http://cnv.mopt.go.cr/cnc/proyectos/san%20josé-san%20ram.html http://www.mopt.go.cr/cnc/proyectos/firma-contratosj-sr.html http://www.transparenciacr.org/ver.php/207#

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data