San Jose Caldera Highway

Sector: Commercial • Location: Costa Rica

Source: World Bank Group

Project
Active

On December 20, 2007, Costa Rica recieved the final approval from the comptroller general for 25 year greenfield BOT contract between the Costa Rican transport ministry (MOPT) and Autopistas del Sol SA to build, own, and operate a 76.8 km highway linking the capital of San Jose with Caldera Port. The highway was designed in three stretches: San José-Ciudad Colón (14.2km), Ciudad Colón-Orotina (38.

Project Information FAQ

Project Information

5 Q
The project “San Jose Caldera Highway” is an infrastructure initiative in the Commercial sector, located in Costa Rica. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On December 20, 2007, Costa Rica recieved the final approval from the comptroller general for 25 year greenfield BOT contract between the Costa Rican transport ministry (MOPT) and Autopistas del Sol SA to build, own, and operate a 76.8 km highway linking the capital of San Jose with Caldera Port. The highway was designed in three stretches: San José-Ciudad Colón (14.2km), Ciudad Colón-Orotina (38.8km) and Orotina-Caldera (23.8km). It included additional safety measures, such as improved marking and lighting, and improved designs for gutters, drains, pavement, and slopes. In order to accommodate the additional safety measures, 30 months were given for construction instead of the initial 24 months. The San Jose – Caldera Highway was originally awarded to a consortium of Cartellone, Acosol and SNC Lavalin in 2001 and the concession contract was signed in 2003. The consortium of Cartellone, Acosol and SNC Lavalin won the contract through a competitive tender in which eight consortia pre-qualified, but only this consortium submitted technical and final bids. Several others requested a tender delay in order to secure finance but the request was rejected. In 2004, the consortium requested the termination of the concession contract because of delays in obtaining right of way for the highway. In 2005, the national concessions council (CNC) authorized the transfer of the concession contract to Autopistas del Sol SA the contract with the approval of the general comptroller. Autopistas del Sol SA was comprised of: Sacyr Vallehermoso (SyV) [Spain, 35%], Caja Madrid [Spain, 17.5%], Grupo Soares da Costa [Portugal, 17%], Fomento de Construcciones y Contratas S.A. (FCC) [Spain, 17.5%] and M&S DI-MS Desarrollos Internacionales [Costa Rica 13%]. By February 2013, Autopistas del Sol was wholly-owned by Globalvia, a subsidiary of the Spanish group FCC. After the project was awarded to Autopistas del Sol SA, the government added additional safety measures for the project and demanded that the equity of the concessionaires be kept in a special trust. Although the project was signed in 2005, it could not be implemented immediately because it did not have the approval of the general comptroller. Financial closure was reached on December 21, 2007 through a US $247 million syndication that was arranged by the Central American Bank for Economic Integration (BCIE) and Caja Madrid. The Multilateral Investment Guarantee Agency (MIGA) gave a guarantee of US $152.96 million that was to cover US $143.96 of Caja Madrid’s debt and US $9.1 million of FCC’s equity against the risks of: transfer restriction, expropriation, war and civil disturbance, and breach of contract for a period of 18 years. Total project cost was estimated at US $330 million. The remainder of the project was to be financed through equity. Construction was scheduled to begin in January 2008 and end in 2010. The highway opened in January 2010.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data