San Jose Outfall
Sector: Cement • Location: CA, United States of America (USA)
Source: Anvil Builders
The scope of this project entails a replacement of flow meters, weirs, and electrical upgrades to the San Jose Wastewater Treatment Plants outfall channel. Due to the location of this project (an artesian slough that drains to the bay) understandably there were strict environmental requirements to adhere to. For example, we had biologists performing bird nest monitoring, there were tide work windo
- Sector
- Cement, Manufacturing (Industrial), Metal, Power Generation (CCGT), Steel, Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- CA, United States of America
- Updated
- 22 Jul 2026
- Source
- Anvil Builders
ConstructChat
Ask ConstructChat about San Jose Outfall
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of this project entails a replacement of flow meters, weirs, and electrical upgrades to the San Jose Wastewater Treatment Plants outfall channel. Due to the location of this project (an artesian slough that drains to the bay) understandably there were strict environmental requirements to adhere to. For example, we had biologists performing bird nest monitoring, there were tide work windows, and open trench restrictions to name a few. The bulk of the work for this project can be broken down into 3 main scopes. First is the flow meter replacement. This involved excavating and shoring a pit between 2 live existing RCP outfall pipes. 3 CIDH piles were then drilled and installed between the 2 RCP pipes. A pile cap was then installed and a precast flow meter vault placed on the pile cap. The second main project scope was the weir upgrades. This involved installing a geogrid fabric inside the slough with the help of divers. New riprap was then placed on top of the fabric with a long reach excavator. Additionally, the old wooden weir boards were replaced with new aluminum weirs. This weir was not shut down for our construction so this work had to be done during a high tide work window with the help of divers. The third main scope of the project was to install a new transformer and 3,500 LF of concrete encased duct bank from the outfall station back to the main treatment plant. |
Location
Country | United States of America (USA) |
State | CA |
Source
Source reliability | High |
Source | Anvil Builders |
URL |
More Details
Record type | Project |
Sector | Cement, Manufacturing (Industrial), Metal, Power Generation (CCGT), Steel, Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2023-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America (USA)
- Intrenchment Creek Viaduct Rehabilitation
- Bolton Road & Phillip Lee Pump Stations Rehabilitation
- Clear Creek Chemical System Improvements (Bid Package 1) and System-wide Flow
- Custer Avenue Combined Sewer Control Facility – Additional Screens
- Division Street/Route 65 Interchange Project
- Sorrels Overpass Over I-70
- Route 39 Railroad Crossing Improvements/Overpass/Quiet Zone
- I-44 Rebuild at MO 744/Mulroy Road