San Jose Outfall

Sector: Cement • Location: CA, United States of America (USA)

Source: Anvil Builders

Project

The scope of this project entails a replacement of flow meters, weirs, and electrical upgrades to the San Jose Wastewater Treatment Plants outfall channel. Due to the location of this project (an artesian slough that drains to the bay) understandably there were strict environmental requirements to adhere to. For example, we had biologists performing bird nest monitoring, there were tide work windo

Project Information FAQ

Project Information

3 Q
The project “San Jose Outfall” is an infrastructure initiative in the Cement sector, located in CA, United States of America (USA). Taiyo aggregates data on it from Anvil Builders.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The scope of this project entails a replacement of flow meters, weirs, and electrical upgrades to the San Jose Wastewater Treatment Plants outfall channel. Due to the location of this project (an artesian slough that drains to the bay) understandably there were strict environmental requirements to adhere to. For example, we had biologists performing bird nest monitoring, there were tide work windows, and open trench restrictions to name a few. The bulk of the work for this project can be broken down into 3 main scopes. First is the flow meter replacement. This involved excavating and shoring a pit between 2 live existing RCP outfall pipes. 3 CIDH piles were then drilled and installed between the 2 RCP pipes. A pile cap was then installed and a precast flow meter vault placed on the pile cap. The second main project scope was the weir upgrades. This involved installing a geogrid fabric inside the slough with the help of divers. New riprap was then placed on top of the fabric with a long reach excavator. Additionally, the old wooden weir boards were replaced with new aluminum weirs. This weir was not shut down for our construction so this work had to be done during a high tide work window with the help of divers. The third main scope of the project was to install a new transformer and 3,500 LF of concrete encased duct bank from the outfall station back to the main treatment plant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data