San Jose Outfall
Sector: Cement • Location: CA, United States of America (USA)
Source: Anvil Builders
The scope of this project entails a replacement of flow meters, weirs, and electrical upgrades to the San Jose Wastewater Treatment Plants outfall channel. Due to the location of this project (an artesian slough that drains to the bay) understandably there were strict environmental requirements to adhere to. For example, we had biologists performing bird nest monitoring, there were tide work windo
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The scope of this project entails a replacement of flow meters, weirs, and electrical upgrades to the San Jose Wastewater Treatment Plants outfall channel. Due to the location of this project (an artesian slough that drains to the bay) understandably there were strict environmental requirements to adhere to. For example, we had biologists performing bird nest monitoring, there were tide work windows, and open trench restrictions to name a few. The bulk of the work for this project can be broken down into 3 main scopes. First is the flow meter replacement. This involved excavating and shoring a pit between 2 live existing RCP outfall pipes. 3 CIDH piles were then drilled and installed between the 2 RCP pipes. A pile cap was then installed and a precast flow meter vault placed on the pile cap. The second main project scope was the weir upgrades. This involved installing a geogrid fabric inside the slough with the help of divers. New riprap was then placed on top of the fabric with a long reach excavator. Additionally, the old wooden weir boards were replaced with new aluminum weirs. This weir was not shut down for our construction so this work had to be done during a high tide work window with the help of divers. The third main scope of the project was to install a new transformer and 3,500 LF of concrete encased duct bank from the outfall station back to the main treatment plant. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Cement projects in United States of America (USA)
- SH 6 Reconstruction - Gorman
- Memorial Drive from BW 8 to Tallowood Road
- Pappajohn Biomedical Discovery Building
- Northwest Corridor Managed Lanes P3
- AMLI Lofts
- Chaparral Water Treatment Plant
- Building Aviation Hartsfield-Jackson Atlanta International Airport – CONRAC Automated People Mover
- Roosevelt Collection Parking Garage