logo
Project

San Jose Outfall

Sector: Cement • Location: CA, United States of America (USA)

Source: Anvil Builders

The scope of this project entails a replacement of flow meters, weirs, and electrical upgrades to the San Jose Wastewater Treatment Plants outfall channel. Due to the location of this project (an artesian slough that drains to the bay) understandably there were strict environmental requirements to adhere to. For example, we had biologists performing bird nest monitoring, there were tide work windo

Sector
Cement, Manufacturing (Industrial), Metal, Power Generation (CCGT), Steel, Water Supply and Storage, Waste Processing and Treatment, Government
Location
CA, United States of America
Updated
22 Jul 2026
Source
Anvil Builders

ConstructChat

Ask ConstructChat about San Jose Outfall

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “San Jose Outfall” is an infrastructure initiative in the Cement sector, located in CA, United States of America (USA). Taiyo aggregates data on it from Anvil Builders.

Participants

Sponsoring Agency

Company

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of this project entails a replacement of flow meters, weirs, and electrical upgrades to the San Jose Wastewater Treatment Plants outfall channel. Due to the location of this project (an artesian slough that drains to the bay) understandably there were strict environmental requirements to adhere to. For example, we had biologists performing bird nest monitoring, there were tide work windows, and open trench restrictions to name a few. The bulk of the work for this project can be broken down into 3 main scopes. First is the flow meter replacement. This involved excavating and shoring a pit between 2 live existing RCP outfall pipes. 3 CIDH piles were then drilled and installed between the 2 RCP pipes. A pile cap was then installed and a precast flow meter vault placed on the pile cap. The second main project scope was the weir upgrades. This involved installing a geogrid fabric inside the slough with the help of divers. New riprap was then placed on top of the fabric with a long reach excavator. Additionally, the old wooden weir boards were replaced with new aluminum weirs. This weir was not shut down for our construction so this work had to be done during a high tide work window with the help of divers. The third main scope of the project was to install a new transformer and 3,500 LF of concrete encased duct bank from the outfall station back to the main treatment plant.

Location

Country

United States of America (USA)

State

CA

Source

Source reliability

High

Source

Anvil Builders

URL

More Details

Record type

Project

Sector

Cement, Manufacturing (Industrial), Metal, Power Generation (CCGT), Steel, Water Supply and Storage, Waste Processing and Treatment, Government

Article published date

2023-11-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project