logo
ProjectClosed

San Jose Performing Art Chiller Cooling Tower&Boiler Replace

One of 10,000+ projects Taiyo tracks in California.

Source: Dodge

The Project generally involves the replacement of one (1) electrical main switchboard, one (1) water-cooled chiller, one (1) cooling tower, two (2) chilled water pumps, two (2) condenser water pumps, two (2) heating hot water boilers, two (2) heating hot water pumps, and upgrades to systems controls. It involves the installation of a new refrigerant monitoring system and purge exhaust.

Status
Closed
Sector
Water Supply and Storage, Government, Power Generation (CCGT), Oil and Gas, Commercial, Manufacturing (Industrial)
Location
San Jose, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about San Jose Performing Art Chiller Cooling Tower&Boiler Replace

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “San Jose Performing Art Chiller Cooling Tower&Boiler Replace” is an infrastructure initiative in the Water Supply and Storage sector, located in San Jose, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project generally involves the replacement of one (1) electrical main switchboard, one (1) water-cooled chiller, one (1) cooling tower, two (2) chilled water pumps, two (2) condenser water pumps, two (2) heating hot water boilers, two (2) heating hot water pumps, and upgrades to systems controls. It involves the installation of a new refrigerant monitoring system and purge exhaust.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Jose

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Power Generation (CCGT), Oil and Gas, Commercial, Manufacturing (Industrial)

Article published date

2025-08-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project