San Jose Substation Upgrade Phase I Project
Sector: Automotive • Location: San Francisco, California, United States of America
Source: SFMTA Projects
San Jose Substation Upgrade Phase I Project Share this: Facebook Twitter LinkedIn Project Introduction Powered by the ongoing effort to improve the Muni system, the SFMTA is upgrading the San Jose Substation at the Green Metro Yard. This upgrade will increase the traction power that propels Muni light rail vehicles (LRVs). Substaion upgrade and infrastructure improvements will take place in Green
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | San Jose Substation Upgrade Phase I Project Share this: Facebook Twitter LinkedIn Project Introduction Powered by the ongoing effort to improve the Muni system, the SFMTA is upgrading the San Jose Substation at the Green Metro Yard. This upgrade will increase the traction power that propels Muni light rail vehicles (LRVs). Substaion upgrade and infrastructure improvements will take place in Green Metro Yard Project Timeline October 2020 Completion of Design Pending Early 2021 Award Contract Pending April 2021 - August 2022 Construction Pending Improvements Construction is anticipated to begin in spring 2021 and will continue for about 16 months from 7 a.m. to 4 p.m., Monday through Friday. Night and weekend work may occur as needed . All work will be limited inside the Green Metro Yard and the San Jose Substation. It will not impact the train operation or public access. Currently, the existing San Jose Substation feeder circuit is the only power circuit serving the Green Metro Yard. Crews will split the Green Metro Yard into two separate circuits in order to increase the overall traction power capacity. Under this plan, the existing feeder circuit will be upgraded and continue to supply power to eastern half of the yard and the maintenance shop. The spare feeder breaker will pick up the remaining western half of the yard. This will almost double the traction power supply for LRVs in the Green Metro Yard. Upgraded components include electrical, overhead, and structural installation of traction power feeder cables, feeder breaker and switchgear, system monitoring and control, and replacement of the existing overhead cables and overhead supporting pole. Other electrical work will modify the existing ground protection device, and the existing San Jose Substation Supervisory Control and Data Acquisition system. Crews will reconstruct an existing Overhead Contact System (OCS) pole and foundation, associated OCS components, and install a new above ground steel plate connection for the anchoring of the aerial traction power cables to the existing steel column. Contact Information Jay Lu, Public Relations Officer jay.lu@sfmat.com 415.701.438 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
