logo

San Leandro Creek Trail

Sector: Bridge • Location: California, United States of America

Source: Alameda County Public Works Agency

Project
Due To Uprr’S Resistance To Approve A Trail Crossing Within Uprr Right-Of-Way Under The Railroad Bridge, The Original Proposed Trail Project Is Being Phased (1a And 1b) To Allow More Time To Negotiate With Uprr For The Potential Trail Implementation. Phase 1a Limits Are Between Hegenberger Road And 0.25 Mile Upstream Of 98 Th Avenue To Columbian Gardens Park On Empire Road. Phase 1b Limits Are Between End Of Phase 1a And 105 Th Avenue Passing Under Uprr Bridge And I-880 Freeway. The District Is In The Process Of Updating The Phase 1a Scope And Budget, And To Obtain Cnra’S Approval Prior To Project Advertisement For Bids. This Project Is Currently In Design Phase.

The San Leandro Creek Trail Restoration Project between Hegenberger Road and 105 th Avenue will create a 1.2-mile scenic, multi-use trail along the San Leandro Creek in Oakland. When completed, Class 1 trail will give walkers and bikers convenient access to the beautiful San Leandro Creek and provide a safe route for local residents to commute to nearby schools, parks, and the Bay front. This proj

Project Information FAQ

Project Information

4 Q
The project “San Leandro Creek Trail” is an infrastructure initiative in the Bridge sector, located in California, United States of America. Taiyo aggregates data on it from Alameda County Public Works Agency.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

due to uprr’s resistance to approve a trail crossing within uprr right-of-way under the railroad bridge, the original proposed trail project is being phased (1a and 1b) to allow more time to negotiate with uprr for the potential trail implementation. phase 1a limits are between hegenberger road and 0.25 mile upstream of 98 th avenue to columbian gardens park on empire road. phase 1b limits are between end of phase 1a and 105 th avenue passing under uprr bridge and i-880 freeway. the district is in the process of updating the phase 1a scope and budget, and to obtain cnra’s approval prior to project advertisement for bids. this project is currently in design phase.

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The San Leandro Creek Trail Restoration Project between Hegenberger Road and 105 th Avenue will create a 1.2-mile scenic, multi-use trail along the San Leandro Creek in Oakland. When completed, Class 1 trail will give walkers and bikers convenient access to the beautiful San Leandro Creek and provide a safe route for local residents to commute to nearby schools, parks, and the Bay front. This project also includes two new pedestrian bridges and traffic signals at Hegenberger Road and 98 th Avenueto providesafe crossingat thesebusy intersections. The trail will be 10 feet wide with shoulders on each side and will start along the south flood control maintenance access road of San Leandro Creek between Hegenberger Road and the end of Empire Road in Oakland. At the end of Empire Road, the trail will cross to the north side of the channel and run underneath Union Pacific Railroad (UPRR) and I-880 freeway bridges, through District-owned property to connect to 105th Avenue. Safety guard railing and educational and informational signs will be installed along the trail, as well as and a vegetated swale along the south side. Over 300 trees will be planted along the trail. This project is funded by the California Urban Greening Grant Program (Senate Bill 859; administered by the California Natural resources Agency (CNRA)) in an effort to reduce greenhouse gas emissions, enhance neighborhood parks, provide public green space, mitigate urban heat, and develop non-motorized urban trails that provide safe routes for travel between residences, workplaces, commercial centers, and schools.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data