logo

San Lorenzo River Bridge and Kings Creek Bridge Replacement

Sector: Bridge • Location: Boulder Creek, California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Proposed

The California Department of Transportation (Caltrans) proposes to replace the San Lorenzo River Bridge (Bridge Number 36-0052) at post mile 13.6 and Kings Creek Bridge (Bridge Number 36-0054) at post mile 15.5 on State Route 9 in Santa Cruz County, in the unincorporated community of Boulder Creek. The project will remove and replace both bridges with new single-span, standard-width structures con

Project Information FAQ

Project Information

5 Q
The project “San Lorenzo River Bridge and Kings Creek Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Boulder Creek, California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The California Department of Transportation (Caltrans) proposes to replace the San Lorenzo River Bridge (Bridge Number 36-0052) at post mile 13.6 and Kings Creek Bridge (Bridge Number 36-0054) at post mile 15.5 on State Route 9 in Santa Cruz County, in the unincorporated community of Boulder Creek. The project will remove and replace both bridges with new single-span, standard-width structures consisting of 12-foot-wide lanes and 8-foot-wide outside shoulders. At the San Lorenzo River, the new bridge will be 106 feet long and 40 feet wide and will replace the existing bridge at this location, which is the same length but only 31 feet wide. At Kings Creek, the new bridge will be 99 feet long and 40 feet wide and will replace the existing bridge at this location, which is 88 feet long and 28 feet wide. The existing metal beam guardrail at both bridges will be replaced with standard Midwest Guardrail Systems, which will be connected to each side of the bridges. A taper will be paved on the sides of each bridge to transition the new 8-foot-wide shoulders to the existing roadway shoulders. Work in the streambeds is proposed and will require the use of a temporary diversion system to dewater work areas for demolition and removal of existing bridge abutments and piers. Because the existing abutments at both bridges were constructed by casting materials directly into the exposed bedrock within the stream channel, the abutments will be partially removed in an effort to minimize removal of bedrock and alteration of the stream channel. Abutments and side support columns at the San Lorenzo River Bridge will be removed to the extent required to make space for the new bridge abutments, and therefore will not be removed to original grade. At the Kings Creek Bridge, a portion of existing sacked concrete (0.049 acre), located approximately 10 feet above the Ordinary High Water Mark, along the existing northern abutment, will be replaced with rock slope protection. The existing pier located below the Ordinary High Water Mark will be removed to approximately 3 feet below original grade. This will result in an increase of about 22 square feet of critical habitat area for special-status fish species at Kings Creek. It is expected that all work will occur within the existing state and County road rights-of-way; no new right-of-way will be necessary. The owner will relocate existing utilities that would conflict with construction operations before and during construction. The proposed bridges will be built along the existing State Route 9 alignment. State Route 9 is a rural and mountainous highway that stretches 35 miles from State Route 1 in the city of Santa Cruz along the Pacific Coast to State Route 17 in the town of Los Gatos at the southern edge of the greater San Francisco Bay Area. State Route 9 passes through the San Lorenzo Valley and the Saratoga Gap in the Santa Cruz Mountains. The proposed project area is a section of the travel corridor that is in a rural setting surrounded by residential land uses.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data