logo

San Luis Potosi Wastewater Treatment

Sector: Water Supply and Storage • Location: Mexico

Source: World Bank Group

Project
Active

In June 2004 the municipality of San Luis Potosi, Mexico, awarded a 20 years build, operate, and transfer contract for a wastewater treatment plant to private consortium consortium Aguas de Reuso del Tenorio SA. The project included the construction (two year duration) and operation (18 year duration) of a plant with a capacity of 1050 liters of water per second in primary processing and 450 liter

Project Information FAQ

Project Information

5 Q
The project “San Luis Potosi Wastewater Treatment” is an infrastructure initiative in the Water Supply and Storage sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In June 2004 the municipality of San Luis Potosi, Mexico, awarded a 20 years build, operate, and transfer contract for a wastewater treatment plant to private consortium consortium Aguas de Reuso del Tenorio SA. The project included the construction (two year duration) and operation (18 year duration) of a plant with a capacity of 1050 liters of water per second in primary processing and 450 liters in secondary advanced processing in the city of San Luis Potosi, the capital of the state bearing the same name. The plant was expected to cover 60 percent of the city’s sewage treatment needs. The consortium Aguas de Reuso del Tenorio SA won the contract for the $342 million (Euro 263 million) project through a competitive bid. The consortium was comprised of French company Suez (41 percent under their subsidiary Degremont), Japanese group Sumitomo Corporation (39 percent), and Mexican engineering firm Prodin (20 percent). Project financing for the $315 million (Euro 263 million) project was provided by subsidies from the Mexican government covering 40 percent of the project’s costs, a loan from BANOBRAS covering 30 percent, and the consortium’s own funds for the remaining 30 percent. The facility was designed to channel 57 percent of the water after primary treatment to a lagoon then distribute it to farmers, for agricultural uses. The remaining 43% was intended to go through secondary and tertiary treatment, making it fit for use as coolant fluid in the neighboring thermal power station of Villa de Reyes. The plant became operational in April 2005.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data