logo

San Luis Potosi Wastewater Treatment

Sector: Commercial • Location: Mexico

Source: World Bank Group

Project
Active

In June 2004 the municipality of San Luis Potosi, Mexico, awarded a 20 years build, operate, and transfer contract for a wastewater treatment plant to private consortium consortium Aguas de Reuso del Tenorio SA. The project included the construction (two year duration) and operation (18 year duration) of a plant with a capacity of 1050 liters of water per second in primary processing and 450 liter

Status
Prospective
Sector
Commercial, Geothermal, Water Supply and Storage, Power Generation (CCGT), Raw Materials, Waste Processing and Treatment, Government
Location
Mexico
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about San Luis Potosi Wastewater Treatment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “San Luis Potosi Wastewater Treatment” is an infrastructure initiative in the Commercial sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In June 2004 the municipality of San Luis Potosi, Mexico, awarded a 20 years build, operate, and transfer contract for a wastewater treatment plant to private consortium consortium Aguas de Reuso del Tenorio SA. The project included the construction (two year duration) and operation (18 year duration) of a plant with a capacity of 1050 liters of water per second in primary processing and 450 liters in secondary advanced processing in the city of San Luis Potosi, the capital of the state bearing the same name. The plant was expected to cover 60 percent of the city’s sewage treatment needs. The consortium Aguas de Reuso del Tenorio SA won the contract for the $342 million (Euro 263 million) project through a competitive bid. The consortium was comprised of French company Suez (41 percent under their subsidiary Degremont), Japanese group Sumitomo Corporation (39 percent), and Mexican engineering firm Prodin (20 percent). Project financing for the $315 million (Euro 263 million) project was provided by subsidies from the Mexican government covering 40 percent of the project’s costs, a loan from BANOBRAS covering 30 percent, and the consortium’s own funds for the remaining 30 percent. The facility was designed to channel 57 percent of the water after primary treatment to a lagoon then distribute it to farmers, for agricultural uses. The remaining 43% was intended to go through secondary and tertiary treatment, making it fit for use as coolant fluid in the neighboring thermal power station of Villa de Reyes. The plant became operational in April 2005.

Original sector

Water and sewerage

Budget

Location

Country

Mexico

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Water Supply and Storage, Power Generation (CCGT), Raw Materials, Waste Processing and Treatment, Government

Article published date

2024-06-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project