San Marcos Thermal Power Plant
One of 68 projects Taiyo tracks in Santa Cruz.
Source: World Bank Group
A consortium of Duke (38%), Petrobras (21%), Monteiro Aranha (18%), Emprese Electrica Corani (17%) and CRE (Cooperativa Rural de Electrificacion) (6%) is constructing a 110-MW natural gas fired power plant at Puerto Suarez. The construction works on the new thermal power plant started in Dec. 2000 and should be completed by the end of 2001. Almost all of the plant's output will be exported to Coru
- Status
- Prospective
- Sector
- Geothermal, Natural Gas, Metal, Power Generation (CCGT), Steel, Government
- Location
- Santa Cruz, Bolivia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about San Marcos Thermal Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A consortium of Duke (38%), Petrobras (21%), Monteiro Aranha (18%), Emprese Electrica Corani (17%) and CRE (Cooperativa Rural de Electrificacion) (6%) is constructing a 110-MW natural gas fired power plant at Puerto Suarez. The construction works on the new thermal power plant started in Dec. 2000 and should be completed by the end of 2001. Almost all of the plant's output will be exported to Corumba (Brazil) through a transmission line in the region. The electricity will be used in a new iron production complex to be set up at Corumba. In 2003 Monteiro Aranha and CRE transferred their shares to the other three shareholders whereby the new ownership structure was Duke (49%), Petrobras (27%), and Corani (24%). Empresa Corani is an electricy distributor that was 50 percent divested - Duke Energy holds a 50 percent share in Corani (therefore Duke's total share is 61 percent, by direct investment 49 percent and indirect investment through Corani of 12 percent). None None |
Original sector | Energy |
Budget |
Location
Country | Bolivia |
State | Santa Cruz |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Geothermal, Natural Gas, Metal, Power Generation (CCGT), Steel, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in Bolivia
- Electrical Energy With Natural Gas
- Program for Rural Electrification with Renewable Energy
- ENDE III
- Hidrocarbons Reserves Studies
- Renewable energy generation
- Preparation of the Sur Lipez Geothermal Project (BO-L1057)
- Management Plan for Tunari National Park
- Bitcoin Mining Project at Idle Gas-Fired Thermal Power Plant in Cochabamba