San Marcos Viaduct

Sector: Bridge • Location: Mexico

Source: FCC Construction

Project
Closed

The San Marcos Viaduct is in Mexico, in the Nuevo Necaxa - Ávila Camacho section, belonging to the Mexico D.F.-Tuxpán corridor, which will improve communication between the federal capital and the Gulf of Mexico coast.This 36-kilometre long section, constructed by FCC Mexico in a joint venture with the Mexican company ICA, crosses the Sierra Madre Oriental in a region of difficult terrain that req

Project Information FAQ

Project Information

3 Q
The project “San Marcos Viaduct” is an infrastructure initiative in the Bridge sector, located in Mexico. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The San Marcos Viaduct is in Mexico, in the Nuevo Necaxa - Ávila Camacho section, belonging to the Mexico D.F.-Tuxpán corridor, which will improve communication between the federal capital and the Gulf of Mexico coast.This 36-kilometre long section, constructed by FCC Mexico in a joint venture with the Mexican company ICA, crosses the Sierra Madre Oriental in a region of difficult terrain that required the construction of six tunnels and twelve viaducts with a total length of six kilometres.Pier 4 is 208 metres high and places this viaduct as the second highest in the world behind Millau in France.The San Marcos Viaduct is 850 metres long and has 180-metre spans, with an 18.7-metre wide single deck for both motorway roadways.Pier 4 was constructed using auto-climbing formwork: its construction used highly-advanced climbing and pumping equipment, which allowed high-performance execution without any incidents despite access difficulties.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data