San Rafael Existing Pump Station Replacement
Sector: Water Supply and Storage • Location: San Rafael, California, United States of America
Source: Dodge
Project consists of replacing an existing pump station. Work will include construction of new pump station complete with wet well, valve pit, all pump controls, gravity sewer, forcemain, asphalt paving, service and maintenance of existing pump station, traffic control, and pedestrian detour.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial
- Location
- San Rafael, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about San Rafael Existing Pump Station Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of replacing an existing pump station. Work will include construction of new pump station complete with wet well, valve pit, all pump controls, gravity sewer, forcemain, asphalt paving, service and maintenance of existing pump station, traffic control, and pedestrian detour. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Rafael |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
