logo

San Ysidro Land Port of Entry, Phase 3

Sector: Automotive • Location: San ysidro, California, United States of America

Source: Clark Construction

Project

Designed to address travel delays in the busiest land port in the world, the San Ysidro Land Port of Entry (SYLPOE), Phase 3 project included a new southbound vehicular operations facility, the expansion of the northbound vehicular operations facility, improved access roads, a parking structure, security fencing, and site lighting, as well as upgraded geothermal heat exchange, video surveillance,

Project Information FAQ

Project Information

5 Q
The project “San Ysidro Land Port of Entry, Phase 3” is an infrastructure initiative in the Automotive sector, located in San ysidro, California, United States of America. Taiyo aggregates data on it from Clark Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Designed to address travel delays in the busiest land port in the world, the San Ysidro Land Port of Entry (SYLPOE), Phase 3 project included a new southbound vehicular operations facility, the expansion of the northbound vehicular operations facility, improved access roads, a parking structure, security fencing, and site lighting, as well as upgraded geothermal heat exchange, video surveillance, and stormwater management systems. Five southbound lanes with ten inspection booths and eight northbound lanes with fifteen inspection booths were also added. Complexity at Every Stage The level of coordination required to build this 16-acre project within a 52-acre campus was significant, involving eight federal, state, and city agencies, the United States Marines and National Guard, and a bi-national collaboration with the Mexican government. The heightened presence of military and law enforcement on site became routine as the national conversation on immigration and trade intensified over the course of the project. Constant communication with the US Customs and Border Protection, Marines, and National Guard was essential to maintaining both port operations and public safety. One of the more difficult components of the job was executing a 57-hour closure of the southbound lanes of traffic on Interstates 5 and 805, which allowed the team to demolish an existing canopy, remove crash barriers and old striping, and install new striping and utility lines. Shutting down a freeway is a big deal in traffic-weary Southern California, but the team executed the closure without chaos and reopened the lanes 12 hours earlier than scheduled. Their success hinged on a full year of planning, which involved coordinating trolleys, buses, and tow trucks and a media relations campaign to keep drivers informed. The most distinguishing visual element of the project is a 750-foot-long, catenary-suspended canopy above the vehicle inspection booths. The steel and ethylene tetrafluoroethylene canopy affords uninterrupted sightlines and illumination for officers as they perform inspections. It also serves as a canvas for “Double Horizon,” an art installation comprised of LED lights that run the length of the canopy’s southern side. Much like a suspension bridge, the design and installation of the 200-ton canopy called for extensive preparation and coordination with numerous stakeholders. The erection sequence was meticulously plotted, starting with digging a foundation six feet deep and 50 feet long featuring a 17-foot-wide pile cap that required 10 tons of rebar in mast, and then filling it with concrete. The canopy was then installed with a jacking system and lifted with two crawler cranes. Sustainable Design for Future Savings In addition to streamlining efficiencies, SYLPOE was envisioned as a “Port of the Future,” with strong investments in sustainable and renewable elements that would lower operational costs while reducing the carbon footprint. The campus’ green approach includes the use of porous pavements, bioswales, bioretention and infiltration cells, and xeriscaping to mitigate stormwater runoff from adjacent hillsides. A rainwater collection system from the canopies and rooftops is recycled for non-potable use. Other sustainable strategies include solar power, a solar thermal hot water system, a geothermal heat exchange system, and shading and daylighting in buildings to reduce energy use. Combined, sustainable features are projected to save $34 million over the next 40 years.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data