SANAA W/S & SEWERAGE
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The main elements of the project are: (a) construction and equipment of about 10 wells for a total capacity of 200 l/s; (b) installation of well header and transmission pipeline to convey water to the headworks; (c) purchase and installation of pumps and motor drives to increase the pumping capacity by 150 l/s; (d) construction of a reservoir of 10,000 cubic meters; (e) supply and laying of distri
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Yemen
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SANAA W/S & SEWERAGE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main elements of the project are: (a) construction and equipment of about 10 wells for a total capacity of 200 l/s; (b) installation of well header and transmission pipeline to convey water to the headworks; (c) purchase and installation of pumps and motor drives to increase the pumping capacity by 150 l/s; (d) construction of a reservoir of 10,000 cubic meters; (e) supply and laying of distribution pipes, 18,000 water connections and 50 public taps; (f) laying of sewers and construction of sewage collectors and interceptors in the most densely populated areas; (g) construction of stabilization ponds with a capacity of 65,000 cubic meters/day and related facilities; (h) installation of 8,700 sewage connections; (i) supply of sewer maintenance and laboratory equipment; (j) consulting services for project design and construction supervision; (k) feasibility studies for water supply and sewerage in two medium cities, Ibb and Dhamar; and (l) technical assistance to YAR construction industry. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Yemen |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Yemen, Republic of
- ADEN PORT REHABILITATION
- RY-RURAL WATER SUPPLY ADD. FINANCING
- Yemen Integrated Urban Services Emergency Project
- Additional Financing for Third Social Fund for Development Project
- TIHAMA DEVT SUPPLEMENT
- Yemen: Pilot Program for Climate Resilience Phase I (PPCR I)
- RY-TAIZ WATER SUPPLY PILOT
- Yemen Emergency Human Capital Project
