Sanasa Loan
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
Sanasa () is the municipality-owned water and sanitation company of Campinas in the state of São Paulo, Brazil. The proposed IFC investment will be used to finance eligible subprojects with limited environmental and social (E&S) impacts located in urban and peri-urban areas, as those described below (the Project).I. Water Supply subprojects aimed to improve water security, increas
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Sanasa Loan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sanasa (www.sanasa.com.br) is the municipality-owned water and sanitation company of Campinas in the state of São Paulo, Brazil. The proposed IFC investment will be used to finance eligible subprojects with limited environmental and social (E&S) impacts located in urban and peri-urban areas, as those described below (the Project).I. Water Supply subprojects aimed to improve water security, increase the reliability of local water systems and eliminate deficiencies: - Water storage facilities: construction of 14 water storage facilities, with a total volume of 48,200 m³, increasing by 34% the existing storage capacity;- Water distribution system: construction of 3 water distribution networks in the neighborhoods of Monte Belo, Bananal and Gargantilha, including two water pumping stations, two water storage facilities (total volume of 400 m³) and a total of 41 km of water distribution network, benefiting 8,200 people;II. Sewage Collection and Treatment subprojects aimed at expanding sewage collection and treatment capacity:- Sewage collection: construction of the Campos Elíseos trunk collector, with 5,2 km of linear network, benefiting 8,500 people;- Waste Water Treatment Plan (WWTP) expansion: the treatment capacity expansion of two wastewater treatment plants - WWTP Nova América and WWTP Piçarrão;- WWTP reversion: redirect sewage from WWTP Santa Mônica (to be decommissioned) to WWTP Boa Vista, which will require the construction of a sewage pumping station and 2,2km of linear network, benefiting 35,000 people.III. Reuse Water Production subproject aimed to improve the treatment, revitalize the receptor water body, eliminate impacts on affected communities related to air pollution and increase the offer of reuse water:- WWTP Anhumas retrofit to modernize sewage treatment technology by changing the traditional Upflow Anaerobic Sludge Blanket (UASB) to activated sludge treatment combined with membranes (ultrafiltration). |
Original sector | C-BA - Water and Wastewater Utilities |
Location
Country | Brazil |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
