Sand City Coastal Desalination Plant

Sector: Car parking • Location: Thailand

Source: Water Technology

Project
Closed

The $11.9m plant became operational in April 2010. Energy recovery devices cut the energy requirement of the facility by 60%. All internal RO equipment, pumps and piping within the facility were installed in March 2009. Sand City Coastal Desalination Plant is California's first full-scale seawater desalination facility. The plant has a single-rack RO skid design with four separate columns of p

Project Information FAQ

Project Information

4 Q
The project “Sand City Coastal Desalination Plant” is an infrastructure initiative in the Car parking sector, located in Thailand. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The $11.9m plant became operational in April 2010. Energy recovery devices cut the energy requirement of the facility by 60%. All internal RO equipment, pumps and piping within the facility were installed in March 2009. Sand City Coastal Desalination Plant is California's first full-scale seawater desalination facility. The plant has a single-rack RO skid design with four separate columns of pressure vessels. The plant uses reverse osmosis (RO) process to desalinate brackish seawater. Sand City Coastal Desalination Plant is the first full-scale seawater desalination facility in the state of California. It is capable of producing 300 acre-ft of water (98 million gallons approximately) a year and uses reverse osmosis (RO) process to desalinate brackish seawater. The plant became operational in April 2010. The official opening ceremony was held in May 2010. Funding for the $11.9m project came from two sources. An amount of $2.9m was provided by the California Department of Water Resources through Proposition 50 Grant funding and the remaining $9m was covered by the city itself through redevelopment funds and city capital improvement funds. Sand City located in Monterey County, California is a small city with just a few hundred permanent residents. It is a popular shopping and tourist destination with almost 40,000 people visiting every day. The new plant has been built with the aim of providing the city with a long-term water supply. Before the commissioning of this plant, the city used to purchase 100% of their water from CalAm. Sand City had limited water resources and regional efforts to deal with this situation had not produced good results for more than 20 years due to financial and political reasons. The city therefore decided to build a desalination plant on its own in cooperation with California American Water (CalAm), the region’s public water utility. The project for providing the city with a source of potable water had been in the pipeline since the late 1990’s. The Environmental Impact Report (EIR) for the project was completed and certified in January 2005. In May 2005, the coastal development permit was unanimously approved by the California Coastal Commission. The city received $2.9m in Proposition 50 Grant funding from the Department of Water Resources in June 2007. The plant is designed in such a way that there are no adverse environmental effects to coastal resources, including marine organisms, groundwater supplies and sensitive habitat areas. Chemical composition of the concentrate produced as a result of the treatment will be very similar to that of original sea water. As a result, its injection in a below sea-level horizontal well beneath the coastal bluff is not expected to substantially change the existing seawater / freshwater interface. It will also not increase salinity in the Bay. The facility includes four brackish water feed wells, a concentrate disposal well and associated pipelines and components. Of the four wells that are used to pump sea water to the plant, two are in use at any given time. These are over 18m deep and located 61m from the surf line and over 760m from the plant. Size of the feed pumps was reduced by more than 60% by using energy recovery devices. This will reduce the long-term operating cost and improve the overall plant efficiency. The plant has a single-rack RO skid design with four separate columns of pressure vessels. The configuration reduced the footprint and interconnection piping. The façade of the plant was designed by David Martin & Associates. Construction began in March 2008 with four extraction water wells, pipelines and the treatment facility. Drilling of the brine discharge well and feed wells, and pipeline laying works were completed by the end of 2008. By the end of March 2009, the treatment facility building shell and parking lot were completed, all internal RO equipment, pumps and piping within the facility were installed, and final testing of the facility and system were initiated. The project also involved construction of a tunnel and installation of associated pipeline beneath State Highway 1. The supplied sea water is first filtered through cartridge filters followed by single-stage reverse osmosis membranes which have been designated to receive 2-log (99%) removal credits. The resultant water is then disinfected using ultraviolet (UV) disinfection to achieve an additional 3-log (99.9%) inactivation of Cryptosporidium and Giardia. In order to achieve an additional 4-log (99.99%) virus inactivation, the UV disinfected water is then chlorinated and stabilised with the existing distribution system water by blending carbon dioxide, a calcite contactor and caustic soda. The new plant is owned by the Sand City and is being operated by CalAm. Design-build contract of the plant was awarded to CDM Constructors. Apart from installing four seawater intake wells and twin 10″ PVC Pipelines, MGE Underground carried out jack and bore of State Highway 1, joint trench construction, repaving and beach access work. Creegan + D’Angelo Engineers Prepared the preliminary design documentation. The pressure exchanger was supplied by Energy Recovery.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data