Sand Hollow Pump Station Meter Replacement
One of 10,000+ projects Taiyo tracks in Utah.
Source: Dodge
The Project consists of removal of the existing meter vault and piping, removal of existing 60 welded steel pipeline and the installation of new 60 inch flanged pipe, construction of a new concrete vault, installing owner furnished meter, and furnishing and installing a new submersible pump in an existing drain manhole, and miscellaneous related work.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Steel, Commercial, Waste Processing and Treatment, Metal
- Location
- St. George, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sand Hollow Pump Station Meter Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of removal of the existing meter vault and piping, removal of existing 60 welded steel pipeline and the installation of new 60 inch flanged pipe, construction of a new concrete vault, installing owner furnished meter, and furnishing and installing a new submersible pump in an existing drain manhole, and miscellaneous related work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | St. George |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Steel, Commercial, Waste Processing and Treatment, Metal |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
