Sandakan-1 and Seguntor Biomass Power Plants
Sector: Consumer Products • Location: Malaysia
Source: World Bank Group
In August 2006, Kina Biopower and Seguntor Bioenergy started construction of two 10 MW power plants using empty fruit bunches as fuel in Sandakan, Sabah. The project had been registered as a CDM (Clean Development Mechanism) project with the UN, and was expected to generate CO2 emissions credits. The power plant was slated to begin operations in March of 2008 with an estimated cost of US$25 millio
- Status
- Prospective
- Sector
- Consumer Products, Biomass, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Sandakan-1 and Seguntor Biomass Power Plants
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In August 2006, Kina Biopower and Seguntor Bioenergy started construction of two 10 MW power plants using empty fruit bunches as fuel in Sandakan, Sabah. The project had been registered as a CDM (Clean Development Mechanism) project with the UN, and was expected to generate CO2 emissions credits. The power plant was slated to begin operations in March of 2008 with an estimated cost of US$25 million. The produced electricity would be sold to Sabah Eletricity Sdn Bhd under long purchase agreement. Kina Biopower Sdn Bhd is a joint venture of Chubu Electric (Japan, 18%), GoBio (Malaysia, 40%), SMEC (Malaysia, 30%), and Agritech Marketing Co. Ltd (Japan, 12%). The project scheme was that Chubu Electric would provide the loan in return Chubu would receive CO2 emission credits (approximately 2 tons). Hong Kong Shanghai Bank Co (HSBC) handled the financing of the loan. The both power plants have been in commercial operation since mid January 2009. |
Original sector | Energy |
Budget |
Location
Country | Malaysia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Biomass, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
