Sandbridge Beach Public Access Improvements - Phase 11
Sector: Forest Products and Packaging • Location: Virginia Beach, Virginia, United States of America
Source: Dodge
Provide the construction of timber walkway and site improvements at Access 17 (3018 Sandfiddler Road, Sandbridge), and Access 26 (2630 Sandfiddler Road, Sandbridge). The site improvements includes installation of concrete sidewalk, bike racks, bollards, signs, curb and gutter, and detectable warning surface.
- Status
- Closed
- Sector
- Forest Products and Packaging, Government, Cement, Road, Commercial, Car parking, Automotive
- Location
- Virginia Beach, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sandbridge Beach Public Access Improvements - Phase 11
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provide the construction of timber walkway and site improvements at Access 17 (3018 Sandfiddler Road, Sandbridge), and Access 26 (2630 Sandfiddler Road, Sandbridge). The site improvements includes installation of concrete sidewalk, bike racks, bollards, signs, curb and gutter, and detectable warning surface. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Virginia Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Government, Cement, Road, Commercial, Car parking, Automotive |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States of America
- CS 572/OAK STREET FROM REYNOLDS STREET TO BURNS STREET - TIA
- CR 29/OLD WEST POINT ROAD @ CHATTAHOOCHEE RIVER TRIB
- BUILDING PAPER, SIDING TRIM, DECK COATING INSTALL NEW GSM FL ASHING AT TRELLIS TOP BEAM, SHARES PLANS W/202202613
- BUILDING PAPER, SIDING TRIM, DECK COATING INSTALL NEW GSM FL ASHING AT TRELLIS TOP BEAM, SHARES PLANS W/202202614
- GLENWOOD-LUMBER CITY ROAD
- CALHOUN STREET FROM JONES STREET TO S OF JONES STREET - TIA
- JOHNSON STREET IN LUMBER CITY - TIA
- HELEN STREET IN LUMBER CITY
