Sandow Lakes Ranch Energy Hub
Sector: Solar • Location: Dallas, Texas, United States
Source: D Magazine
Dallas-based Xebec is building an integrated energy hub on 33,000 acres at Sandow Lakes Ranch, including a 1.2 GW combined-cycle natural gas plant and 300 MW of solar, aiming to deliver 350 MW by 2026 and 3.9 GW after 2028. The project includes scaling up Sandow's critical electricity switch with two more 1.2 GW switches planned.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Dallas-based Xebec is building an integrated energy hub on 33,000 acres at Sandow Lakes Ranch, including a 1.2 GW combined-cycle natural gas plant and 300 MW of solar, aiming to deliver 350 MW by 2026 and 3.9 GW after 2028. The project includes scaling up Sandow's critical electricity switch with two more 1.2 GW switches planned. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
