logo

Sandrini Solar Park 200 MW

Sector: Energy Storage • Location: California, United States of America

Source: Dodge USA

Project
Start

Develop, construct, and operate a 300 megawatt (MW) alternating current (AC) solar photovoltaic facility and necessary associated infrastructure, including up to 100 MW of battery energy storage, on approximately 3,447.33 acres of privately-owned land. The project would be supported by both a 70 kilovolt (kV) and a 230 kV overhead and/or underground electrical transmission lines originating from t

Status
Under Construction
Sector
Energy Storage, Car parking, Power Generation (CCGT), Solar, Automotive, Commercial
Location
California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Sandrini Solar Park 200 MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sandrini Solar Park 200 MW” is an infrastructure initiative in the Energy Storage sector, located in California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Develop, construct, and operate a 300 megawatt (MW) alternating current (AC) solar photovoltaic facility and necessary associated infrastructure, including up to 100 MW of battery energy storage, on approximately 3,447.33 acres of privately-owned land. The project would be supported by both a 70 kilovolt (kV) and a 230 kV overhead and/or underground electrical transmission lines originating from two on-site project collector substations and terminating at its interconnection point with Pacifi...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Energy Storage, Car parking, Power Generation (CCGT), Solar, Automotive, Commercial

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project