Sandsloot Underground Mine Development
Planned · Limpopo · Last reported Dec 2026
Source: Mining.com
Valterra Platinum is developing an underground mine at the Sandsloot pit within the Mogalakwena open-pit mine in South Africa. The project aims to start trial mining in late 2026, with a ramp-up to a 3.6 to 4.5 million tonne per year operation possible beyond 2030. The underground mine is expected to increase Mogalakwena concentrate production by 10% to 50%.
- Status
- Prospective
- Sector
- Mining
- Location
- Mogalakwena, Limpopo, South Africa
- Updated
- 22 Jul 2026
- Source
- Mining.com
ConstructChat
Ask ConstructChat about Sandsloot Underground Mine Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Valterra Platinum is developing an underground mine at the Sandsloot pit within the Mogalakwena open-pit mine in South Africa. The project aims to start trial mining in late 2026, with a ramp-up to a 3.6 to 4.5 million tonne per year operation possible beyond 2030. The underground mine is expected to increase Mogalakwena concentrate production by 10% to 50%. |
Original sector | Mining |
Location
Country | South Africa |
State | Limpopo |
City | Mogalakwena |
Source
Source | Mining.com |
URL |
More Details
Record type | Project |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
