Sandy Boulevard Permanent Power & Hook Ups
Design development · Utah · Last reported Apr 2023
Source: Dodge USA
The Sandy City Parks Division will need permanent power and emergency hook ups installed at the Sandy City Centennial Parkway. The contractor shall provide and install metering enclosures, distribution panels, power pedestals, and associated conduit (bored) and conductors. Contractor shall also provide transformer pads and conduit for use by Utah Power as described in the project plans and specifi
- Status
- Prospective
- Sector
- Car parking, Power Generation (CCGT), Power Transmission, Government, Road, Automotive, Commercial
- Location
- Sandy, Utah, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sandy Boulevard Permanent Power & Hook Ups
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Sandy City Parks Division will need permanent power and emergency hook ups installed at the Sandy City Centennial Parkway. The contractor shall provide and install metering enclosures, distribution panels, power pedestals, and associated conduit (bored) and conductors. Contractor shall also provide transformer pads and conduit for use by Utah Power as described in the project plans and specifications. Project will need to be completed by June 9, 2023. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Sandy |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Generation (CCGT), Power Transmission, Government, Road, Automotive, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
