Sandy Creek Basin Sewer Rehabilitation
Sector: Water Supply and Storage • Location: Henderson, North Carolina, United States of America
Source: Dodge USA
The Project consists generally of the following major items: 1. NCDEQ DWI has awarded state funding to the City of Henderson in order to reduce inflow and infiltration to correct sanitary sewer overflows (SSOs) within the Sandy Creek Wastewater Basin. The project will utilize a find-it, fix it approach by first smoke/dye testing, cleaning, and conducting NASSCO PACP & MACP inspection on approximat
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)
- Location
- Henderson, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sandy Creek Basin Sewer Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists generally of the following major items: 1. NCDEQ DWI has awarded state funding to the City of Henderson in order to reduce inflow and infiltration to correct sanitary sewer overflows (SSOs) within the Sandy Creek Wastewater Basin. The project will utilize a find-it, fix it approach by first smoke/dye testing, cleaning, and conducting NASSCO PACP & MACP inspection on approximately 63,250 LF of gravity sewer within the basin. Based upon NASSCO PACP and MACP inspection revie... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Henderson |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
