SANDY RUN CREEK TRAIL - PHASE I
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
The proposed work will provide sidewalk along Milledgeville Rd (SR 10/US 278) beginning near Blanchard Ave and ending at a proposed access drive to a proposed trailhead paved parking area. The proposed improvements on Milledgeville Rd will include a new 5 ft wide concrete sidewalk with a decorative chain link fence adjacent to a steep drop off for pedestrian safety. The length of proposed sidewalk
- Status
- Closed
- Sector
- Cement, Road, Car parking, Government, Automotive
- Location
- Harlem, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SANDY RUN CREEK TRAIL - PHASE I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed work will provide sidewalk along Milledgeville Rd (SR 10/US 278) beginning near Blanchard Ave and ending at a proposed access drive to a proposed trailhead paved parking area. The proposed improvements on Milledgeville Rd will include a new 5 ft wide concrete sidewalk with a decorative chain link fence adjacent to a steep drop off for pedestrian safety. The length of proposed sidewalk is 150 LF. The proposed multi-use trail is named Sandy Run Creek Trail and the proposed trail improvements include constructing a 10 foot wide multi-use trail of project length 2,832 LF. Beginning at the new 5 ft wide concrete sidewalk along Milledgeville Rd (SR 10/US 278), the trail will be composed of inch thick graded aggregate base course, bituminous tack coat, and inches of 9.5 mm asphalt concrete. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Harlem |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Car parking, Government, Automotive |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
