logo

SANDY RUN CREEK TRAIL - PHASE I

Sector: Cement • Location: Harlem, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The proposed work will provide sidewalk along Milledgeville Rd (SR 10/US 278) beginning near Blanchard Ave and ending at a proposed access drive to a proposed trailhead paved parking area. The proposed improvements on Milledgeville Rd will include a new 5 ft wide concrete sidewalk with a decorative chain link fence adjacent to a steep drop off for pedestrian safety. The length of proposed sidewalk

Project Information FAQ

Project Information

4 Q
The project “SANDY RUN CREEK TRAIL - PHASE I” is an infrastructure initiative in the Cement sector, located in Harlem, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed work will provide sidewalk along Milledgeville Rd (SR 10/US 278) beginning near Blanchard Ave and ending at a proposed access drive to a proposed trailhead paved parking area. The proposed improvements on Milledgeville Rd will include a new 5 ft wide concrete sidewalk with a decorative chain link fence adjacent to a steep drop off for pedestrian safety. The length of proposed sidewalk is 150 LF. The proposed multi-use trail is named Sandy Run Creek Trail and the proposed trail improvements include constructing a 10 foot wide multi-use trail of project length 2,832 LF. Beginning at the new 5 ft wide concrete sidewalk along Milledgeville Rd (SR 10/US 278), the trail will be composed of inch thick graded aggregate base course, bituminous tack coat, and inches of 9.5 mm asphalt concrete.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data