logo
ProjectPlanned

Sandy Run Solar Project

Planned · South Carolina · Last reported May 2026

Source: Post and Courier

The Sandy Run Solar project is a planned large-scale solar farm proposed by RWE Solar Development to be built on 1,500 acres of woodlands and farmland in northwestern Berkeley County, South Carolina. The project aims to generate 198 megawatts of electricity, enough to power 37,500 homes, and is designed to tie into Santee Cooper's system to help address an anticipated energy shortfall by 2029. The

Status
Prospective
Sector
Solar, Power Generation (CCGT), Raw Materials
Location
Cross, South Carolina, United States of America
Updated
22 Jul 2026
Source
Post and Courier

ConstructChat

Ask ConstructChat about Sandy Run Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Sandy Run Solar Project” is an infrastructure initiative in the Solar sector, located in Cross, South Carolina, United States. Taiyo aggregates data on it from Post and Courier.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Sandy Run Solar project is a planned large-scale solar farm proposed by RWE Solar Development to be built on 1,500 acres of woodlands and farmland in northwestern Berkeley County, South Carolina. The project aims to generate 198 megawatts of electricity, enough to power 37,500 homes, and is designed to tie into Santee Cooper's system to help address an anticipated energy shortfall by 2029. The solar farm is part of a larger 7,500-acre planned development, with the remaining 6,000 acres managed by the landowner. The project includes plans for wildlife-permeable fencing and blueberry cultivation beneath the solar panels. If approved, the project would create up to 100 construction jobs and generate over $45 million in revenue for the county and its school district. The lease for the land would last 35 to 45 years, after which the solar panels would be decommissioned and recycled or disposed of.

Original sector

Energy

Location

Country

United States of America (USA)

State

South Carolina

City

Cross

Source

Source

Post and Courier

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Raw Materials

Article published date

2026-05-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project