Sangachal Terminal Electrification (STEL) Project
Sector: Warehouse • Location: Baku, Azerbaijan
Source: Maritime Logistics Professional
The STEL project involves electrification of Azerbaijan's largest oil and gas reception terminal, the Sangachal Terminal. The project aims to enable the country's transition to national grid supply and reduce emissions.
- Status
- Closed
- Sector
- Warehouse, Seaport, Oil and Gas
- Location
- Baku, Azerbaijan
- Updated
- 22 Jul 2026
- Source
- Maritime Logistics Professional
ConstructChat
Ask ConstructChat about Sangachal Terminal Electrification (STEL) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The STEL project involves electrification of Azerbaijan's largest oil and gas reception terminal, the Sangachal Terminal. The project aims to enable the country's transition to national grid supply and reduce emissions. |
Original sector | Energy |
Location
Country | Azerbaijan |
City | Baku |
Source
Source | Maritime Logistics Professional |
URL |
More Details
Record type | Project |
Sector | Warehouse, Seaport, Oil and Gas |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in Azerbaijan
- Fatoglu Istehsal Azerbaycan, Ltd.
- Baku International Sea Trade Port Alyat (Phase 1)
- International Logistics Centre, Alyat
- Baku International Sea Trade Port Alyat (Phase 3)
- Baku International Sea Trade Port Alyat (Phase 2)
- Azerbaijan: Banka and Bilasuvar 760 MW Solar PV Power Project
- Shafag Solar Power Plant
- ASCO Ro-PAX Ferry Construction
