Sangachal Terminal Electrification (STEL) Project
Sanctioned · Azerbaijan · Last reported Jun 2025
Source: PV Tech
A project to electrify the Sangachal terminal, an industrial oil and gas processing complex near Baku, Azerbaijan. The project involves connecting the terminal to the national grid operated by AzerEnerji and adding a new 220/110 kV substation. It is a joint venture between bp, ExxonMobil, TotalEnergies, and Azerbaijani entities. The project aims to reduce operational emissions by replacing seven g
- Status
- Closed
- Sector
- Oil and Gas, Manufacturing (Industrial), Solar
- Location
- Baku, Azerbaijan
- Updated
- 22 Jul 2026
- Source
- PV Tech
ConstructChat
Ask ConstructChat about Sangachal Terminal Electrification (STEL) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | sanctioned |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A project to electrify the Sangachal terminal, an industrial oil and gas processing complex near Baku, Azerbaijan. The project involves connecting the terminal to the national grid operated by AzerEnerji and adding a new 220/110 kV substation. It is a joint venture between bp, ExxonMobil, TotalEnergies, and Azerbaijani entities. The project aims to reduce operational emissions by replacing seven gas turbines with electrification. |
Original sector | Energy |
Location
Country | Azerbaijan |
City | Baku |
Source
Source | PV Tech |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Manufacturing (Industrial), Solar |
Article published date | 2025-06-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Oil and Gas projects in Azerbaijan
- Fatoglu Istehsal Azerbaycan, Ltd.
- Trans-Anatolian Pipeline
- Janub Thermal Power Plant
- SOCAR Ammonia/Urea Project
- Sumgait Combined Cycle Power Plant
- Shah Deniz Stage II Gas Field Expansion Project
- Bank Respublika Expanding Access to Credit for Women and Agriculture Borrowers Project
- Azerbaijan: Republic of Azerbaijan COVID-19 Active Response and Expenditure Support (CARES) Program
