Sangachal Terminal Electrification (STEL) Project
Sector: Power Generation (CCGT) • Location: Baku, Azerbaijan
Source: Apa.az
The Sangachal Terminal Electrification project involves connecting the Sangachal oil and gas terminal to the national grid via new facilities including a 220/110 kV electricity substation. This will allow the removal of gas turbines currently used for power generation, reducing operational emissions by around 50%. The project is managed by bp as the operator of the terminal and is planned to be co
- Status
- Prospective
- Sector
- Power Generation (CCGT), Oil and Gas, Government
- Location
- Baku, Azerbaijan
- Updated
- 22 Jul 2026
- Source
- Apa.az
ConstructChat
Ask ConstructChat about Sangachal Terminal Electrification (STEL) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Sangachal Terminal Electrification project involves connecting the Sangachal oil and gas terminal to the national grid via new facilities including a 220/110 kV electricity substation. This will allow the removal of gas turbines currently used for power generation, reducing operational emissions by around 50%. The project is managed by bp as the operator of the terminal and is planned to be completed in two stages by the end of 2028. |
Original sector | Energy |
Budget |
Location
Country | Azerbaijan |
City | Baku |
Source
Source | Apa.az |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Oil and Gas, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
