logo
ProjectClosed

Sangdeh Villa / AsNow Design & Construct

One of 1,623 projects Taiyo tracks in Iran.

Source: ArchDaily

The sloping roof was removed to reduce the overall volume of the project. Eliminating the sloping roof offered a panoramic view of the surrounding nature. It provided the opportunity to connect the building with northern land at the upstream height via a bridge due to increased light in the northern rooms of the project. The height of the northern courtyard was lowered, and a grid screen was added

Status
Closed
Sector
Road, Car parking, Bridge, Residential, Commercial, Automotive
Location
Iran
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Sangdeh Villa / AsNow Design & Construct

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sangdeh Villa / AsNow Design & Construct” is an infrastructure initiative in the Road sector, located in Iran. Taiyo aggregates data on it from ArchDaily.

Participants

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The sloping roof was removed to reduce the overall volume of the project. Eliminating the sloping roof offered a panoramic view of the surrounding nature. It provided the opportunity to connect the building with northern land at the upstream height via a bridge due to increased light in the northern rooms of the project. The height of the northern courtyard was lowered, and a grid screen was added to expand the terrace.Text description provided by the architects.In the design of the Sangde Villa, we faced a two-story building on topography with a beautiful view, which was about 7 meters above the street level. The client requested an expansion of the existing building while minimizing any obstruction to the stunning view. This expansion formed the design concept to include an elevator, covered parking, and a janitor's suite. The expansion began at street level; in this new situation, we encountered a four-story building that looked out of place in the area. To address the project’s disproportionality, the building was placed on a solid stone base in harmony with its surroundings.The main idea for overall building volume is the penetration and horizontal extension of the additional part into internal spaces. The box that has emerged from nature's heart features green-blue tiles, which get their color from the blue sky and green nature. This box welcomes the audience from the outer borders to the inner spaces and creates an opportunity for vertical connection in the project. In completing the final idea, the grid system of beams and columns on the project’s façade can beautifully frame the surrounding views. This porous grid, a shell, covers the entire building mass. A cover that delicately integrates the new cube into the existing building.The project's physical layout prioritizes public space views and is divided into four levels. The first level includes a parking area and a service box equipped with an elevator. The second level houses the janitor's suite, engine room, and another service box with an elevator. The third level comprises bedrooms, a living room, a service box with public and shower facilities, a dressing room, stairs, and an elevator. The fourth level features a reception and dining room, kitchen, terrace, and another service box with public and dressing facilities, a stairwell, and an elevator.

Location

Country

Iran

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Road, Car parking, Bridge, Residential, Commercial, Automotive

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project