Sangtuda 1 Hydropower Plant
Sector: Hydro • Location: Tajikistan
Source: World Bank Group
Joint Russian-Tajik company Sangtudinskaya GES-1, a subsidiary of Inter RAO UES, was developing the 670 MW Sungtuda 1 Hydropower Plant Vakhsh River, Danghara District, Khatlon Province. Annual output was estimated at 2,700 GWh, by 4 167.5 MW Francis turbines from Power Machines. The equity was held by the Government of Russia (66.39%), the Government of Tajikistan (16.45%), FGC UES (14.92%) and I
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Joint Russian-Tajik company Sangtudinskaya GES-1, a subsidiary of Inter RAO UES, was developing the 670 MW Sungtuda 1 Hydropower Plant Vakhsh River, Danghara District, Khatlon Province. Annual output was estimated at 2,700 GWh, by 4 167.5 MW Francis turbines from Power Machines. The equity was held by the Government of Russia (66.39%), the Government of Tajikistan (16.45%), FGC UES (14.92%) and Inter RAO UES (2.24%). FGC UES (Federal Grid Company of Unified Energy System) (MICEX-RTS: FEES) was a Russian Transmission company, owned for 75% by the Russian government. The remaining 25% was free floating, of which the Russian government held ~2% as well. Inter RAO was majority state-owned but publicly traded (MICEX-RTS: IRAO). The project was commissioned in July 2009. Construction resumed in April 2005 after a halt in the early 1990s. The project initially started in 1989. The output is sold to Barqi Tojik, the national electricity company. Construction lasted 4 years, FC is assumed to be June 2006 (25%). The project was recorded as being 84% private (100%-16.45%). Total cost was $720 million. http://en.wikipedia.org/wiki/Sangtuda_1_Hydroelectric_Power_Plant http://en.wikipedia.org/wiki/Inter_RAO_UES |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
