Sangtuda 2 Hydropower Plant
Sector: Wind • Location: Tajikistan
Source: World Bank Group
Iranian Sangob was developing the 220MW Sangtuda 2 Hydropower Plant on the Zeravshan river. The project consisted of two turbines of 110MW each -run-of-river.
The project was executed under a BOT contract with a length of 12.5 years. The first turbine was commissioned in September 2011, construction began in September 2006. The main contractor was Omran Maroon. Equipment was supplied by a Chin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Iranian Sangob was developing the 220MW Sangtuda 2 Hydropower Plant on the Zeravshan river. The project consisted of two turbines of 110MW each -run-of-river. The project was executed under a BOT contract with a length of 12.5 years. The first turbine was commissioned in September 2011, construction began in September 2006. The main contractor was Omran Maroon. Equipment was supplied by a Chinese firm. The project was started in the 1980s but was put on hold after the fall of the USSR. In the early 1990s Iran expressed interest to assist, but a deal was not reached until 2005. Construction lasted 5 years, therefore it is assumed that FC was reached in January 2008 (25%). The project was valued at $220 million, of which $180 million was provided by Iran and $40 million by Tajikistan. Coordinates: 37°58'15?N 69°1'37?E http://www.asianews.it/news-en/Iran-sends-equipment-by-air-to-complete-Sangtuda-2-dam-20447.html http://www.greenbridge.kg/archives/1512 http://tajikwater.net/docs/101202_HydroWorld.html http://oilprice.com/Alternative-Energy/Hydroelectric/Iran-Sending-Equipment-To-Tajikistan-For-Controversial-Hydropower-Plant.html |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
