logo
ProjectGc Bidding

Sanitary Forcemain Replacement Group 2 Phase 2b

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Fallingbrook SPS forcemain: Approximately 105m of 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Fallingbrook Crescent, and Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Greyabbey SPS forcemain: Approximately 310m of twin 150mm diameter High Den

Status
Prospective
Sector
Government, Power Generation (CCGT), Waste Processing and Treatment, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Commercial
Location
Toronto, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Sanitary Forcemain Replacement Group 2 Phase 2b

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sanitary Forcemain Replacement Group 2 Phase 2b” is an infrastructure initiative in the Government sector, located in Toronto, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Fallingbrook SPS forcemain: Approximately 105m of 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Fallingbrook Crescent, and Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Greyabbey SPS forcemain: Approximately 310m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from 150m south of Fordover drive to 100m...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Toronto

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Power Generation (CCGT), Waste Processing and Treatment, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Commercial

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project