Sanitary Sewer Improvements - WESSD 173932
Sector: Water Supply and Storage • Location: Westboro, Wisconsin, United States of America
Source: Dodge USA
Major Quantities on the Project Include: 1 LS Mobilization and Traffic Control 5 Each Remove Existing Sanitary Manhole 7,000 SY Remove Asphalt or Concrete Surface 10 Each Clear and Grub Trees 25 Each Remove Septic Tank and/or Pump Assembly with Electrical Disconnection 2,000 CY Common Excavation 3,000 Ton Crushed Aggregate Base Course 2,000 CY Granular Subbase 5,800 SY Geotextile 1,400 Ton Asphalt
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Generation (CCGT), Road, Waste Processing and Treatment, Car parking, Government, Automotive, Commercial
- Location
- Westboro, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sanitary Sewer Improvements - WESSD 173932
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major Quantities on the Project Include: 1 LS Mobilization and Traffic Control 5 Each Remove Existing Sanitary Manhole 7,000 SY Remove Asphalt or Concrete Surface 10 Each Clear and Grub Trees 25 Each Remove Septic Tank and/or Pump Assembly with Electrical Disconnection 2,000 CY Common Excavation 3,000 Ton Crushed Aggregate Base Course 2,000 CY Granular Subbase 5,800 SY Geotextile 1,400 Ton Asphalt Pavement 600 SF Concrete Sidewalk or Driveway 2,700 LF 8 inch Sanitary Sewer 260 LF 6 inch Water... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Westboro |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Generation (CCGT), Road, Waste Processing and Treatment, Car parking, Government, Automotive, Commercial |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
