Sanitary Sewer Improvements Phase III
Sector: Water Supply and Storage • Location: Carroll, Ohio, United States of America
Source: Dodge USA
The village maintains and operates a pressure collection system with treatment provided by Fairfield County and user rates driven by the regional treatment cost. The village spends more than $30,000 annually on repairing and replacing the individual grinder pumps, which is not sustainable. Nearly half of the collection system has been replaced with gravity sewer and this phase will complete the sy
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Carroll, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sanitary Sewer Improvements Phase III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The village maintains and operates a pressure collection system with treatment provided by Fairfield County and user rates driven by the regional treatment cost. The village spends more than $30,000 annually on repairing and replacing the individual grinder pumps, which is not sustainable. Nearly half of the collection system has been replaced with gravity sewer and this phase will complete the system replacement. The project will benefit 501 people. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Carroll |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
