Sanitary Sewer Improvements REBID
Sector: Water Supply and Storage • Location: Micro, North Carolina, United States of America
Source: Dodge USA
Renovation of Pump Station #7 located on U.S. Hwy 301 North of Micro: Remove and replace existing 105 GPM duplex submersible pumps, rails, floats, and pump controls, and replace them with new items as shown on the contract documents. Remove and Replace the existing Diesel Generator and Automatic Transfer Switch, and all electrical appurtenances, inclusive but not limited to required panels, condui
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Rail, Government, Road
- Location
- Micro, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sanitary Sewer Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Renovation of Pump Station #7 located on U.S. Hwy 301 North of Micro: Remove and replace existing 105 GPM duplex submersible pumps, rails, floats, and pump controls, and replace them with new items as shown on the contract documents. Remove and Replace the existing Diesel Generator and Automatic Transfer Switch, and all electrical appurtenances, inclusive but not limited to required panels, conduit, breakers, switches, and other fixtures, to provide a complete operational product. Install a n... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Micro |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Rail, Government, Road |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
