logo

Sanitary Sewer Rehabilitation Contract 113 Part 2

One of 10,000+ projects Taiyo tracks in Texas.

Source: Dodge USA

Project
Closed

The Sanitary Sewer Rehabilitation Contract 113, Part 2 project consists of: approximately 475 linear feet of 8-inch water and 2,520 linear feet of 12-inch water line replacement in Autumn Drive from Autumn Court to the south dead end; 2,082 linear feet of 8-inch sanitary sewer pipe by open cut along Autumn Drive and within existing easements along the sides and rear of properties along Autumn Driv

Status
Closed
Sector
Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
Location
Fort Worth, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Sanitary Sewer Rehabilitation Contract 113 Part 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sanitary Sewer Rehabilitation Contract 113 Part 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Fort Worth, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Sanitary Sewer Rehabilitation Contract 113, Part 2 project consists of: approximately 475 linear feet of 8-inch water and 2,520 linear feet of 12-inch water line replacement in Autumn Drive from Autumn Court to the south dead end; 2,082 linear feet of 8-inch sanitary sewer pipe by open cut along Autumn Drive and within existing easements along the sides and rear of properties along Autumn Drive, and 10,500 square yards of POL asphalt pavement replacement.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Fort Worth

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project