Sanitary Sewer Rehabilitation Contract 113 Part 2
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge USA
The Sanitary Sewer Rehabilitation Contract 113, Part 2 project consists of: approximately 475 linear feet of 8-inch water and 2,520 linear feet of 12-inch water line replacement in Autumn Drive from Autumn Court to the south dead end; 2,082 linear feet of 8-inch sanitary sewer pipe by open cut along Autumn Drive and within existing easements along the sides and rear of properties along Autumn Driv
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Fort Worth, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sanitary Sewer Rehabilitation Contract 113 Part 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Sanitary Sewer Rehabilitation Contract 113, Part 2 project consists of: approximately 475 linear feet of 8-inch water and 2,520 linear feet of 12-inch water line replacement in Autumn Drive from Autumn Court to the south dead end; 2,082 linear feet of 8-inch sanitary sewer pipe by open cut along Autumn Drive and within existing easements along the sides and rear of properties along Autumn Drive, and 10,500 square yards of POL asphalt pavement replacement. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Fort Worth |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
