Sanitary Sewer Repairs to Serve Coles Crossing Sections 9&10
Sector: Water Supply and Storage • Location: Cypress, Texas, United States of America
Source: Dodge USA
Work includes the removal and replacement of sanitary sewer lines and point repairs within the District. Also, manhole tops and cones shall be repaired. All work shall conform to City of Houston specifications and regulations for sanitary sewer pipe and manholes. All necessary sanitary sewer bypass-pumping shall be provided by the contractor, no separate pay.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Cypress, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sanitary Sewer Repairs to Serve Coles Crossing Sections 9&10
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work includes the removal and replacement of sanitary sewer lines and point repairs within the District. Also, manhole tops and cones shall be repaired. All work shall conform to City of Houston specifications and regulations for sanitary sewer pipe and manholes. All necessary sanitary sewer bypass-pumping shall be provided by the contractor, no separate pay. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Cypress |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
