Sanitary Sewer Replacement of 200mm Sanitary Sewer along Arlington Street between Elgin Street and Mill Street
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The upgrade to the main wastewater line will see the removal of the existing deteriorating pipe. A new 200mm diameter Polyvinyl Chloride (PVC) pipe running the length of approximately 85 meters will be installed. The line directly services 3 households and is the ultimate collection for 16 households and 2 apartment complexes. The watermain and services will be replaced due to the condition. The p
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road, Residential
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Sanitary Sewer Replacement of 200mm Sanitary Sewer along Arlington Street between Elgin Street and Mill Street
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The upgrade to the main wastewater line will see the removal of the existing deteriorating pipe. A new 200mm diameter Polyvinyl Chloride (PVC) pipe running the length of approximately 85 meters will be installed. The line directly services 3 households and is the ultimate collection for 16 households and 2 apartment complexes. The watermain and services will be replaced due to the condition. The project concludes with bringing the road up to town standards. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road, Residential |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
