Sanitary Sewer System Improvements
One of 10,000+ projects Taiyo tracks in Alabama.
Source: Dodge USA
Installation of 58 conventional Onsite Septic Systems and 17 engineered Onsite Septic Systems including abandonment of existing septic tanks (where required) and residential electrical modifications (where requried)
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment, Residential, Commercial
- Location
- Pine Hill, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sanitary Sewer System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of 58 conventional Onsite Septic Systems and 17 engineered Onsite Septic Systems including abandonment of existing septic tanks (where required) and residential electrical modifications (where requried) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Pine Hill |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment, Residential, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
