Sanitary Sewer Twinning of the gravity sewer from Hope Street to the Sewage Treatment Plant to mitigate by-pass during wet weather events
Completed · Ontario
Source: Infrastructure Canada
Twin the gravity sewer from Hope St. to the Sewage Treatment Plant (STP) to mitigate-by-pass during wet weather events. 660m of sanitary sewer twinning on Hope St. South/Lake Street from Shutter Street to east end of energy service company site (ESCO); 490m of sanitary sewer twinning on the easement through ESCO; 300m of sanitary sewer twinning north of Lake Street from Daylighting of Sewer to STP
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Steel, Road, Waste Processing and Treatment, Government, Metal
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Sanitary Sewer Twinning of the gravity sewer from Hope Street to the Sewage Treatment Plant to mitigate by-pass during wet weather events
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Twin the gravity sewer from Hope St. to the Sewage Treatment Plant (STP) to mitigate-by-pass during wet weather events. 660m of sanitary sewer twinning on Hope St. South/Lake Street from Shutter Street to east end of energy service company site (ESCO); 490m of sanitary sewer twinning on the easement through ESCO; 300m of sanitary sewer twinning north of Lake Street from Daylighting of Sewer to STP Headworks. The Sanitary Sewer Twinning project is located on Lake Street, commencing at Hope Street and extending to the Sewage Treatment Plant. The proposed alignment of the pipe and associated length of pipe has slightly changed from the original submission. The project now includes the installation of approximately 575m of 450mm diameter PVC sanitary sewer, 575m of 600mm diameter PVC sewer, concrete maintenance holes, connections to the existing system, by-pass sewer pumping, and approximately 330m of 600mm diameter above grade steel pipe construction including support piers and various other field connections. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Steel, Road, Waste Processing and Treatment, Government, Metal |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
