Sanitary South Trunk Rehabilitation
Sector: Water Supply and Storage • Location: Edmonton, Alberta, Canada
Source: Dodge
The 151 Street Sanitary South Trunk runs beneath the arterial road of 151 Street, from 93 Avenue to 99 Avenue. It is a 1,676 mm by 1,200 mm arch-shaped sanitary trunk, that s approximately 1.03km long, at 27m to 30m deep. The 99 Avenue trunk downstream is a project recently completed, and is not included in this scope of work.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Commercial
- Location
- Edmonton, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sanitary South Trunk Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 151 Street Sanitary South Trunk runs beneath the arterial road of 151 Street, from 93 Avenue to 99 Avenue. It is a 1,676 mm by 1,200 mm arch-shaped sanitary trunk, that s approximately 1.03km long, at 27m to 30m deep. The 99 Avenue trunk downstream is a project recently completed, and is not included in this scope of work. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Edmonton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Commercial |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
