Sankey Park Phase III Improvements
Sector: Car parking • Location: Sweet Home, Oregon, United States of America
Source: Dodge USA
These improvements include sidewalks, paved paths, unpaved trails, site lighting, as well as an ADA-accessible path with switchbacks and viewing platforms that will connect the upper and lower portions of the park. These improvements require engineering and design work, especially when it comes to the steep slope between the two portions of the park. These improvements include sidewalks, paved pat
- Status
- Closed
- Sector
- Car parking, Automotive, Government, Commercial, Residential, Manufacturing (Industrial)
- Location
- Sweet Home, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sankey Park Phase III Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | These improvements include sidewalks, paved paths, unpaved trails, site lighting, as well as an ADA-accessible path with switchbacks and viewing platforms that will connect the upper and lower portions of the park. These improvements require engineering and design work, especially when it comes to the steep slope between the two portions of the park. These improvements include sidewalks, paved paths, unpaved trails, site lighting, as well as an ADA-accessible path with switchbacks and viewing... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Sweet Home |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Automotive, Government, Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
