logo
ProjectClosed

Sant Martí Sarroca Library / Valor-Llimós

Sector: Education

Source: ArchDaily

The new library is located inside the Parc de la Pau. A one-story volume is proposed, semi-buried to the north and open to the south, adapting to the existing slope. The landscaped roof wants to restore the park that the building will occupy and becomes an elevated vantage point from which, taking advantage of the topography of Sant Martí Sarroca, all the inhabited areas of the town can be seen cr

Status
Closed
Sector
Education, Geothermal, Solar, Residential, Commercial, Warehouse
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Sant Martí Sarroca Library / Valor-Llimós

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Sant Martí Sarroca Library / Valor-Llimós” is an infrastructure initiative in the Education sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The new library is located inside the Parc de la Pau. A one-story volume is proposed, semi-buried to the north and open to the south, adapting to the existing slope. The landscaped roof wants to restore the park that the building will occupy and becomes an elevated vantage point from which, taking advantage of the topography of Sant Martí Sarroca, all the inhabited areas of the town can be seen crosswise, from the northern expansion to the Historic-monumental ensemble of the castle to the south, passing through the old quarter, in the center of the valley.A green roof contributes to capturing CO2 and suspended particles, the thermal stability of the last slab, acoustic insulation, and buffering of runoff in the event of torrential rains typical of the Mediterranean climate.Orientation that allows direct solar capture in winter, and protection from direct sun in summer through the porch and wooden slats in front of the openings.Installation of a pergola on the roof of the building, which on the one hand shades the walkway and lookout area, and on the other serves to install photovoltaic panels that feed a high-performance aerothermal machine, and which represents a contribution of 70% of the electrical consumption of the nZEB building.The canopy makes a large overhang to the southwest corner that greets pedestrians and escorts them into the building.The building is a Near Zero Energy Building (nZEB) and energy certified "A". To achieve this, the following strategies have been used:Text description provided by the architects.The construction of the new Sant Martí Sarroca library is an opportunity to organize the space of the park and visually connect all the inhabited areas of the municipality.For this reason, the proposed project is an elevated vantage point, a promenade that connects the existing unevenness..., but above all, it is a piece of the park under which readers take shelter.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Education, Geothermal, Solar, Residential, Commercial, Warehouse

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project