logo

Sant Martí Sarroca Library / Valor-Llimós

Sector: Education

Source: ArchDaily

Project
Closed

The new library is located inside the Parc de la Pau. A one-story volume is proposed, semi-buried to the north and open to the south, adapting to the existing slope. The landscaped roof wants to restore the park that the building will occupy and becomes an elevated vantage point from which, taking advantage of the topography of Sant Martí Sarroca, all the inhabited areas of the town can be seen cr

Project Information FAQ

Project Information

3 Q
The project “Sant Martí Sarroca Library / Valor-Llimós” is an infrastructure initiative in the Education sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The new library is located inside the Parc de la Pau. A one-story volume is proposed, semi-buried to the north and open to the south, adapting to the existing slope. The landscaped roof wants to restore the park that the building will occupy and becomes an elevated vantage point from which, taking advantage of the topography of Sant Martí Sarroca, all the inhabited areas of the town can be seen crosswise, from the northern expansion to the Historic-monumental ensemble of the castle to the south, passing through the old quarter, in the center of the valley.A green roof contributes to capturing CO2 and suspended particles, the thermal stability of the last slab, acoustic insulation, and buffering of runoff in the event of torrential rains typical of the Mediterranean climate.Orientation that allows direct solar capture in winter, and protection from direct sun in summer through the porch and wooden slats in front of the openings.Installation of a pergola on the roof of the building, which on the one hand shades the walkway and lookout area, and on the other serves to install photovoltaic panels that feed a high-performance aerothermal machine, and which represents a contribution of 70% of the electrical consumption of the nZEB building.The canopy makes a large overhang to the southwest corner that greets pedestrians and escorts them into the building.The building is a Near Zero Energy Building (nZEB) and energy certified "A". To achieve this, the following strategies have been used:Text description provided by the architects.The construction of the new Sant Martí Sarroca library is an opportunity to organize the space of the park and visually connect all the inhabited areas of the municipality.For this reason, the proposed project is an elevated vantage point, a promenade that connects the existing unevenness..., but above all, it is a piece of the park under which readers take shelter.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data